Blog

Posts Tagged ‘Pavement installation’

How to Repair Your Old Asphalt Driveway

Thursday, August 11th, 2011

Is your driveway in rough shape? Will repairs do the trick? Does it need to be resurfaced? Should you have it redone professionally? These are all questions that homeowners ask themselves when faced with a dilapidated driveway. Ultimately the best thing to do is the contact a professional like My Pavement Guy, but there are some things you can consider on your own.

According to this article on EzineArticles there are some important things to think about before consulting your contractor:

Maintenance is good medicine, but it’s not foolproof

Asphalt driveways don’t remain smooth and black forever. You can take steps to maintain your driveway by sealing and protecting it, but often the effects of heat, ultra-violet rays, and substances such as salt, oil, gas and grease take their toll. And if those don’t get you, then cracking and water penetration eventually will.

Your driveway may be corroded, worn out, or have cracks, which could all warrant a resurfacing job if the condition is severe enough. As a general guide, if repairs are needed on more than 25 percent of the surface, it is more cost-effective to do a hot mix asphalt resurfacing job over the entire driveway.

Say no to cracks!

Asphalt pavement is hard and brittle, and as a result, cracks will develop over time. Ranging from hairline to an inch wide or more, cracks are your driveway’s worst enemy because they let water in. In colder climates, freeze-thaw cycles can be very destructive, and can wreak havoc on your driveway if water penetrates the cracks, then expands as it turns to ice. And even in warmer climates, water penetration can cause serious damage. The larger the crack, the more serious the problem, and the sooner it needs to be fixed. Cracks that are left un-repaired will lead to serious deterioration of the pavement and even to the base layers, requiring complete replacement of the driveway – sooner rather than later in colder climates.

Can it be fixed or do you need a new driveway?

Whether you’ll need to rip out your existing driveway and install a new one, or if you can get away with resurfacing – or even some patchwork and crack-filling – depends largely on the condition of the base layers, or foundation. However, if cracking covers 3/4 of the driveway, the surface is too far gone to repair. The root of the problems may come from lower down, and a complete overhaul should be considered.

If your driveway has been resurfaced several times with hot mix asphalt and keeps deteriorating prematurely, it is likely a problem with the foundation, and you should consider installing a whole new driveway. Likewise, if there are areas that have depressions or mounds, they should be completely reconstructed from the base. If you have several of these areas, a new driveway might make sense.

For any of your asphalt needs or if you have any questions, contact PTG Enterprises aka My Pavement Guy by calling 410-636-8777 or click here

Check us out on Facebook and Twitter as well!

Pothole Repair: It’s a Bigger Job Than You May Think

Friday, June 24th, 2011

It’s a hole in the road. How hard can it be to fill a hole, right? Well, you might be surprised. Pothole repair is tough work and requires a trained crew and some specialty equipment. This article from PaveManPro.com explains the lengthy repair process.

How to repair a pothole:

1. With a pavement saw or pneumatic hammer, cut the outline of the patch, extending at least 0.3 m (I ft.) outside of the distressed area. The outline should be square or rectangular with two of the sides at right angles to the direction of traffic.

2. Excavate as much pavement as necessary to reach firm support. If a patch is to be an integral part of the pavement, its foundation must be as strong or stronger than that of the original roadway. This may mean that some of the sub-grade will also have to be removed. The faces of the excavation should be straight and vertical.

3. Trim and compact the sub-grade.

4. Apply a tack coat to the vertical faces of the excavation.

5. Backfill with the asphalt mixture. Using a shovel or skid steer loader place the mixture directly from the truck into the prepared excavation. The maximum lift thickness largely depends upon the type of asphalt mixture and the available compaction equipment. Asphalt concrete can and should be placed in deep lifts, since the greater heat retention of the thicker layers facilitates compaction. From a compaction standpoint, patches using asphalt concrete can be backfilled in one lift. However, when placing a patch that is deeper than 3 cm (5 in.) it is often useful to leave the first lift 2.5 to 5 cm (I to 2 in.) below the finished grade, making it easier to judge the total quantity of mixture required for the patch.

On the other hand, patches constructed with mixtures containing emulsified or cutback asphalt must be placed in layers thin enough to permit evaporation of the diluents that make the mixture workable.

6. Spread carefully to avoid segregation of the mixture. Avoid pulling the material from the center of the patch to the edges. If more material is needed at the edge, it should be deposited there, and the excess raked away. The amount of mixture used should be sufficient to ensure that the after compaction the patch surface will not be below that of the adjacent pavement.  On the other hand, if too much material is used a hump will raise.

7. Compact each lift of the patch thoroughly. Use equipment that is suited for the size of the job.  A vibratory plate compactor is excellent for small jobs, while a vibratory roller is likely to be more effective for larger areas. When compacting the final lift (which may be the only lift), overlap the first pass and return of the vibratory roller or plate compactor to no more than 5 cm (6 in.) on to the patch on one side. Then move to the opposite side and repeat the process. Once this is accomplished, proceed at right angles to the compacted edges, with each pass and return overlapping a few inches on to the uncompacted mix. If there is a grade, compaction should proceed from the low side to the high side to minimize possible shoving of the mix.

8. When adequate compaction equipment is used, the surface of the patch should be at the same elevation as the surrounding pavement. However, if hand tamping or other light compaction methods are used, the surface of the completed patch should be slightly higher than the adjacent pavement, since the patch is likely to be further compressed by traffic.

9. Check the vertical alignment and smoothness of the patch with a straightedge or string line.

So next time you complain about that pothole down the street not getting fixed or next time you think to yourself, “hey, I could do that in half the time,” remember that pothole repair is not a quick fix. Properly patching a pothole takes time, know-how, and a lot of energy.

If you have any questions, contact PTG Enterprises by calling 410-636-8777 or click here

Check us out on Facebook and Twitter as well!

A Father’s Day Driveway

Wednesday, June 15th, 2011

It is so hard to find your father a descent present. After all, all you dad really wants for Father’s Day is some peace and quiet and a little relaxation. But how do you give him that?

In a recent poll done by Harris Interactive, 80% of fathers admitted they wanted gifts related to home improvement. So instead of buying dad another tie or some socks, get him something he really wants, a new driveway. Let your father relax as you have your driveway professionally re-paved.

And who better to do the work than PTG Enterprises, a company that has completed well over 2,000 driveway projects. They will deploy an entire team of professionals to quickly install your brand new driveway.

The paving machine, paired with an experienced operator and a trained crew, will make paving look easy – it’s not. Assuming fabric was not in the scope of work, than the paving team will have a man designated to either spray or spot apply tack coat material. Another ground personnel will be responsible for controlling the movement of trucks. It’s crucially important that the trucks stay in order and the next one up is always ready to go. The hotter the asphalt, the easier it is to work with, hence the longer a truck sits, the cooler the asphalt gets. The asphalt is dumped from the truck to the paver where two men control each side. One man is responsible to make sure the joint lines up with the previous paving pull and the other side is responsible for determining thickness, grade, pitch and fall. Accompanying the paver are usually two ground personnel known as “Lute men”. They take direction from the paving foreman and will spread / rake high and low spots out of areas that were just paved but need minor adjustments. Finally, there is the roller man. He is responsible for the compaction of the freshly laid asphalt. Usually this person will work the roller and also plate tampers and hand tampers in the tight areas where pavers cannot go.

So give your dad something he really wants this Father’s Day – a new, professionally installed driveway and some relaxation. If you have any questions, contact PTG Enterprises by calling 410-636-8777 or click here

Check us out on Facebook and Twitter as well!

Beautifying Your Driveway

Tuesday, June 7th, 2011

If you are going to put up the money to install a brand new driveway, or if you are just unhappy with the way your current driveway looks, why not try to add a few accents to make your driveway really standout? It is a lot easier than you may think. As this article from eHow.com explains, there are several ways you can turn that boring driveway into the perfect an eye-catching addition to any front yard.

  1. If you have a long driveway, make it curved instead of a straight line. Installing curves in the driveway to follow the natural contours of your yard can also soften the appearance.
  2. Place stone or brick edging along the edge of the driveway. This will add the perfect accent to your driveway.
  3. Install flower beds along the edge of the driveway. This forms a natural boundary between the driveway and the lawn, and planting flowers can brighten the driveway with an array of colors.
  4. Plant trees along the edge of the driveway. This works better for longer driveways because you have more space to plant trees. One drawback is that it will be years before the trees are fully grown, but once grown the trees provide a shaded canopy over the driveway. Anytime you plant trees near pavement, place them far enough from the pavement that the root system will not grow underneath the pavement and dislodge it.
  5. Install lighting along the driveway. While this doesn’t do anything to soften the appearance of the driveway during the day, it can provide dramatic effects at night. The lighting can be as simple as a post light near the end of the driveway or as complex as lights placed in trees along the driveway that cast their glow down onto the driveway. Another option is to place path lights along the edge of the driveway. Using many lights can provide a runway effect; using a few path lights spaced far apart can mark the edge of the driveway without making you feel like you’re landing a 737 in front of your house.

Now that you know what to do, you can go liven up your front yard. If you have any questions, contact PTG Enterprises by calling 410-636-8777 or click here

How to Identify Pavement Distress

Thursday, June 2nd, 2011

Unfortunately, even the best pavement is not indestructible. Heavy traffic usage and weather changes, along with several other outside factors, can lead to pavement distress, which is noticeable physical damage on roads or sidewalks. If not dealt with quickly, pavement distress can lead to more serious problems, all of which can significantly shorten the lifespan of your pavement.

But how can you spot pavement distress in time? This article from eHow.com explains how you can quickly identify pavement distress.

1.   Assess cracks on the surface of the pavement. Alligator cracking appears as a network of cracks, forming a pattern somewhat like the skin of an alligator or wonky squares. As the U.S. Department of Transportation outlines in its “Pavement Distress Identification Manual for the NPS Road Inventory Program, 2006 -2009,” the severity of the distress can be measured. It is considered low when the width of the crack is less than 1/4 inch in width. However, the alligator distress is serious when the cracks are more than 3/4 inch wide.

2.   Check the pavement’s surface for long strips of cracking. These are ruts that run either along the length of the pavement or sideways across the surface. In places where the cracks are more than 3/4 inch in width, the distress is considered serious and can buckle the pavement, causing bumps. Hot weather can cause this type of pavement distress.

3.   Identify gouged-out areas or dips on the surface of the road. Pavement distress is characterised by potholes. These are concave holes on the surface, which are a nuisance for drivers. The holes can cause punctures in tires, gather water and lead to further cracking.

4.   Look for dark square or rectangular patches of asphalt on the pavement. Distress can be identified by finding discolored areas where potholes or previous distress marks have been filled or covered over. The replacement asphalt causes a dark patch to be seen. Cracking, ruts or potholes can often be seen in proximity to the patching, which is indicative of pavement distress.

5.   Crouch down and look across the surface of the pavement. Identify two lines of depressions in the road’s surface. If these are in the direction of the wheel paths, this distress is called rutting. Rutting occurs when continuous use of the pavement by heavy vehicles causes the surface to sink. It is classified as severe when the depressions are greater than 1 inch below the surface of the pavement.

Once you have identified pavement distress, it is time to repair the damage. There are several products available that allow you to do the job yourself, but if you want to ensure your pavement is properly fixed, it is probably best to call a professional.

If you have any questions or if you would rather leave the repair work to the professionals, contact PTG Enterprises by calling 410-636-8777 or click here

Repairing Lifted Concrete

Wednesday, May 25th, 2011

After Concrete is laid, the inevitable settling, shifting and moving will occur. But in extreme cases, when the ground settles below the concrete or when a tree root comes into contact with the pavement, walkways or patios can break and lift. These unsightly blemishes on your otherwise pristine concrete surface can ruin the entire look and feel of your patio or walkway. And with Memorial Day right around the corner, you are going to want your home to look perfect for your guests.

This article from eHow.com provides 4 ways in which you can quickly repair that broken and lifted concrete.

Instructions

1.     The easiest way to repair lifting concrete pavement is to grind it down. Most driveways are at least 6″ thick by code, so there should be sufficient grinding depth. Walkways and patios are 3″ – 4″ in thickness. Renting a scarifier is probably the most practical way to do this yourself. This is not an easy machine to use, so if you are not comfortable with the job, don’t hesitate to call in a professional.

2.     If the lifting is the result of tree root growth, you will have to grind your cement down repetitively as the roots will continue to push the concrete up. A better solution is to remove the concrete pavement all together, cut out the offending root(s) and re-pour the cement.

3.     A quick fix would be to fill in the ‘step’ created by the raised concrete with a cement adhesive and concrete/polymer fill. Even if you carefully rough up the lower cement, this ramp-like fix will only be a temporary patch at best. It will chip away fairly quickly, especially on a driveway pavement with heavy traffic.

4.     Better left to the professionals, you can float a slab of concrete that has sunk into the ground by drilling holes and pumping in a cement mix. This will literally float the slab back up with the pressure of the concrete beneath.

Now you can enjoy your Memorial Day barbeque without having to hear, “What happened to your patio!?” at least 50 times. If you have any questions or if you would rather leave the repair work to the professionals, contact PTG Enterprises by calling 410-636-8777 or click here today!

Bidding a Pavement Project And Hiring The Right Contractor

Friday, April 15th, 2011

As they say, knowledge is power. The key to making a wise business decision is being educated on the subject. So if you are ready to have any pavement work done around your business, large or small, this is what you need to know before you even think about call a contractor.

Bidding a Pavement Project

1. Request For Proposal (RFP)
This is a method that is widely accepted within the industry when a client has a specific problem and needs that problem corrected. The client has an RFP prepared that clearly specifies the scope of work. This is usually done by an independent source, like a pavement consultant, reserve study engineer or by a contractor you trust. Once this scope is created, it is typically sent to three to five contractors and a pre-bid meeting is scheduled. A pre-bid meeting is another widely accepted practice within the industry. It involves the client, board members, building owners, anchor tenants, and the three to five contractors you picked. This meeting is designed to provide all key parties the opportunity to have a question and answer session. Usually, the RFP is tweaked at these meetings and little changes are made to accommodate either the contractor or the client. A successful pre-bid meeting will have the contractor leaving with a clear understanding of how he/she is to perform the scope of work. And, the client will leave knowing they are going to receive apples-to-apples bidding. It is vitally important that every contractor bid the RFP the same way. The client should avoid at all costs the instinct to send three to five contractors to a site with directions to “evaluate the property and bid the way you think it should be corrected”. This usually produces three to five different scopes of work with wide ranging price swings.

2. Reverse Bidding
This type of bidding has become more popular as budgets have become smaller. When a client needs more work, asphalt patching, sidewalk repairs, etc. then they have budgeted for, the client reveals their budget number to several contractors. For example, “I have $15,000 in the budget for asphalt repairs.” Those contractors then produce competitive bids on the volume of work they are willing to complete for $15,000. For example, contractor A will complete 275 square yards of repair, contractor B will complete 325 square yards of repair, and contractor C will complete 300 square yards of repair. In this scenario, the client would pick contractor B because they are giving you the best value. Once a contract is awarded, the client and contractor would visit the site and determine the worst 325 square yards of repair. If this practice is repeated year after year, a client can usually get a handle on an out of control pavement situation within a few years.

Hiring the Right Contractor

Once you have received an ample number of bids it is time to hire a contractor. You should ask for the following from your pavement contractor:

1. Contractors License: Every state has its own departments of licensing and regulation. This is the agency that issues business and contractors licenses. Make sure any contractor you use is properly licensed. ( My Contractors License Number is MHIC # 51204 )

2. References: Most reputable contractors are eager to furnish references. Check to see if the jobs were performed to satisfaction in a timely, professional manner.

3. A warranty: Too often, business owners or property managers find out after a disappointing experience that there is no warranty on the work. If a warranty is offered, get it in writing. Most contractors place their warranty information on their proposals.

4. A certificate of insurance: These are simple form letters sent out by request from the insurance company that insures the contractor. General liability and workers compensation insurance is easily attainable for legitimate companies.

5. Do not pay full cost in advance: Most state laws prohibit contractors from receiving more than 1/3 of the contract price at the acceptance of the contract. Find out the terms of payment and avoid contractors that only accept cash.

6. Get it in writing: Always get a written contract before you permit work to proceed. This should detail when work is to begin, the exact details of the improvements to be made, the quality of material to be used, an estimated completion date and payment terms. Read the entire contract before signing, including any small print.

If you have any questions, contact PTG Enterprises by calling 443-463-1536 or click here today!