How to Repair Your Old Asphalt Driveway

Thursday, August 11th, 2011

Is your driveway in rough shape? Will repairs do the trick? Does it need to be resurfaced? Should you have it redone professionally? These are all questions that homeowners ask themselves when faced with a dilapidated driveway. Ultimately the best thing to do is the contact a professional like My Pavement Guy, but there are some things you can consider on your own.

According to this article on EzineArticles there are some important things to think about before consulting your contractor:

Maintenance is good medicine, but it’s not foolproof

Asphalt driveways don’t remain smooth and black forever. You can take steps to maintain your driveway by sealing and protecting it, but often the effects of heat, ultra-violet rays, and substances such as salt, oil, gas and grease take their toll. And if those don’t get you, then cracking and water penetration eventually will.

Your driveway may be corroded, worn out, or have cracks, which could all warrant a resurfacing job if the condition is severe enough. As a general guide, if repairs are needed on more than 25 percent of the surface, it is more cost-effective to do a hot mix asphalt resurfacing job over the entire driveway.

Say no to cracks!

Asphalt pavement is hard and brittle, and as a result, cracks will develop over time. Ranging from hairline to an inch wide or more, cracks are your driveway’s worst enemy because they let water in. In colder climates, freeze-thaw cycles can be very destructive, and can wreak havoc on your driveway if water penetrates the cracks, then expands as it turns to ice. And even in warmer climates, water penetration can cause serious damage. The larger the crack, the more serious the problem, and the sooner it needs to be fixed. Cracks that are left un-repaired will lead to serious deterioration of the pavement and even to the base layers, requiring complete replacement of the driveway – sooner rather than later in colder climates.

Can it be fixed or do you need a new driveway?

Whether you’ll need to rip out your existing driveway and install a new one, or if you can get away with resurfacing – or even some patchwork and crack-filling – depends largely on the condition of the base layers, or foundation. However, if cracking covers 3/4 of the driveway, the surface is too far gone to repair. The root of the problems may come from lower down, and a complete overhaul should be considered.

If your driveway has been resurfaced several times with hot mix asphalt and keeps deteriorating prematurely, it is likely a problem with the foundation, and you should consider installing a whole new driveway. Likewise, if there are areas that have depressions or mounds, they should be completely reconstructed from the base. If you have several of these areas, a new driveway might make sense.

For any of your asphalt needs or if you have any questions, contact PTG Enterprises aka My Pavement Guy by calling 410-636-8777 or click here

Check us out on Facebook and Twitter as well!

Pothole Repair: It’s a Bigger Job Than You May Think

Friday, June 24th, 2011

It’s a hole in the road. How hard can it be to fill a hole, right? Well, you might be surprised. Pothole repair is tough work and requires a trained crew and some specialty equipment. This article from PaveManPro.com explains the lengthy repair process.

How to repair a pothole:

1. With a pavement saw or pneumatic hammer, cut the outline of the patch, extending at least 0.3 m (I ft.) outside of the distressed area. The outline should be square or rectangular with two of the sides at right angles to the direction of traffic.

2. Excavate as much pavement as necessary to reach firm support. If a patch is to be an integral part of the pavement, its foundation must be as strong or stronger than that of the original roadway. This may mean that some of the sub-grade will also have to be removed. The faces of the excavation should be straight and vertical.

3. Trim and compact the sub-grade.

4. Apply a tack coat to the vertical faces of the excavation.

5. Backfill with the asphalt mixture. Using a shovel or skid steer loader place the mixture directly from the truck into the prepared excavation. The maximum lift thickness largely depends upon the type of asphalt mixture and the available compaction equipment. Asphalt concrete can and should be placed in deep lifts, since the greater heat retention of the thicker layers facilitates compaction. From a compaction standpoint, patches using asphalt concrete can be backfilled in one lift. However, when placing a patch that is deeper than 3 cm (5 in.) it is often useful to leave the first lift 2.5 to 5 cm (I to 2 in.) below the finished grade, making it easier to judge the total quantity of mixture required for the patch.

On the other hand, patches constructed with mixtures containing emulsified or cutback asphalt must be placed in layers thin enough to permit evaporation of the diluents that make the mixture workable.

6. Spread carefully to avoid segregation of the mixture. Avoid pulling the material from the center of the patch to the edges. If more material is needed at the edge, it should be deposited there, and the excess raked away. The amount of mixture used should be sufficient to ensure that the after compaction the patch surface will not be below that of the adjacent pavement.  On the other hand, if too much material is used a hump will raise.

7. Compact each lift of the patch thoroughly. Use equipment that is suited for the size of the job.  A vibratory plate compactor is excellent for small jobs, while a vibratory roller is likely to be more effective for larger areas. When compacting the final lift (which may be the only lift), overlap the first pass and return of the vibratory roller or plate compactor to no more than 5 cm (6 in.) on to the patch on one side. Then move to the opposite side and repeat the process. Once this is accomplished, proceed at right angles to the compacted edges, with each pass and return overlapping a few inches on to the uncompacted mix. If there is a grade, compaction should proceed from the low side to the high side to minimize possible shoving of the mix.

8. When adequate compaction equipment is used, the surface of the patch should be at the same elevation as the surrounding pavement. However, if hand tamping or other light compaction methods are used, the surface of the completed patch should be slightly higher than the adjacent pavement, since the patch is likely to be further compressed by traffic.

9. Check the vertical alignment and smoothness of the patch with a straightedge or string line.

So next time you complain about that pothole down the street not getting fixed or next time you think to yourself, “hey, I could do that in half the time,” remember that pothole repair is not a quick fix. Properly patching a pothole takes time, know-how, and a lot of energy.

If you have any questions, contact PTG Enterprises by calling 410-636-8777 or click here

Check us out on Facebook and Twitter as well!

A Father’s Day Driveway

Wednesday, June 15th, 2011

It is so hard to find your father a descent present. After all, all you dad really wants for Father’s Day is some peace and quiet and a little relaxation. But how do you give him that?

In a recent poll done by Harris Interactive, 80% of fathers admitted they wanted gifts related to home improvement. So instead of buying dad another tie or some socks, get him something he really wants, a new driveway. Let your father relax as you have your driveway professionally re-paved.

And who better to do the work than PTG Enterprises, a company that has completed well over 2,000 driveway projects. They will deploy an entire team of professionals to quickly install your brand new driveway.

The paving machine, paired with an experienced operator and a trained crew, will make paving look easy – it’s not. Assuming fabric was not in the scope of work, than the paving team will have a man designated to either spray or spot apply tack coat material. Another ground personnel will be responsible for controlling the movement of trucks. It’s crucially important that the trucks stay in order and the next one up is always ready to go. The hotter the asphalt, the easier it is to work with, hence the longer a truck sits, the cooler the asphalt gets. The asphalt is dumped from the truck to the paver where two men control each side. One man is responsible to make sure the joint lines up with the previous paving pull and the other side is responsible for determining thickness, grade, pitch and fall. Accompanying the paver are usually two ground personnel known as “Lute men”. They take direction from the paving foreman and will spread / rake high and low spots out of areas that were just paved but need minor adjustments. Finally, there is the roller man. He is responsible for the compaction of the freshly laid asphalt. Usually this person will work the roller and also plate tampers and hand tampers in the tight areas where pavers cannot go.

So give your dad something he really wants this Father’s Day – a new, professionally installed driveway and some relaxation. If you have any questions, contact PTG Enterprises by calling 410-636-8777 or click here

Check us out on Facebook and Twitter as well!

Beautifying Your Driveway

Tuesday, June 7th, 2011

If you are going to put up the money to install a brand new driveway, or if you are just unhappy with the way your current driveway looks, why not try to add a few accents to make your driveway really standout? It is a lot easier than you may think. As this article from eHow.com explains, there are several ways you can turn that boring driveway into the perfect an eye-catching addition to any front yard.

  1. If you have a long driveway, make it curved instead of a straight line. Installing curves in the driveway to follow the natural contours of your yard can also soften the appearance.
  2. Place stone or brick edging along the edge of the driveway. This will add the perfect accent to your driveway.
  3. Install flower beds along the edge of the driveway. This forms a natural boundary between the driveway and the lawn, and planting flowers can brighten the driveway with an array of colors.
  4. Plant trees along the edge of the driveway. This works better for longer driveways because you have more space to plant trees. One drawback is that it will be years before the trees are fully grown, but once grown the trees provide a shaded canopy over the driveway. Anytime you plant trees near pavement, place them far enough from the pavement that the root system will not grow underneath the pavement and dislodge it.
  5. Install lighting along the driveway. While this doesn’t do anything to soften the appearance of the driveway during the day, it can provide dramatic effects at night. The lighting can be as simple as a post light near the end of the driveway or as complex as lights placed in trees along the driveway that cast their glow down onto the driveway. Another option is to place path lights along the edge of the driveway. Using many lights can provide a runway effect; using a few path lights spaced far apart can mark the edge of the driveway without making you feel like you’re landing a 737 in front of your house.

Now that you know what to do, you can go liven up your front yard. If you have any questions, contact PTG Enterprises by calling 410-636-8777 or click here

How to Identify Pavement Distress

Thursday, June 2nd, 2011

Unfortunately, even the best pavement is not indestructible. Heavy traffic usage and weather changes, along with several other outside factors, can lead to pavement distress, which is noticeable physical damage on roads or sidewalks. If not dealt with quickly, pavement distress can lead to more serious problems, all of which can significantly shorten the lifespan of your pavement.

But how can you spot pavement distress in time? This article from eHow.com explains how you can quickly identify pavement distress.

1.   Assess cracks on the surface of the pavement. Alligator cracking appears as a network of cracks, forming a pattern somewhat like the skin of an alligator or wonky squares. As the U.S. Department of Transportation outlines in its “Pavement Distress Identification Manual for the NPS Road Inventory Program, 2006 -2009,” the severity of the distress can be measured. It is considered low when the width of the crack is less than 1/4 inch in width. However, the alligator distress is serious when the cracks are more than 3/4 inch wide.

2.   Check the pavement’s surface for long strips of cracking. These are ruts that run either along the length of the pavement or sideways across the surface. In places where the cracks are more than 3/4 inch in width, the distress is considered serious and can buckle the pavement, causing bumps. Hot weather can cause this type of pavement distress.

3.   Identify gouged-out areas or dips on the surface of the road. Pavement distress is characterised by potholes. These are concave holes on the surface, which are a nuisance for drivers. The holes can cause punctures in tires, gather water and lead to further cracking.

4.   Look for dark square or rectangular patches of asphalt on the pavement. Distress can be identified by finding discolored areas where potholes or previous distress marks have been filled or covered over. The replacement asphalt causes a dark patch to be seen. Cracking, ruts or potholes can often be seen in proximity to the patching, which is indicative of pavement distress.

5.   Crouch down and look across the surface of the pavement. Identify two lines of depressions in the road’s surface. If these are in the direction of the wheel paths, this distress is called rutting. Rutting occurs when continuous use of the pavement by heavy vehicles causes the surface to sink. It is classified as severe when the depressions are greater than 1 inch below the surface of the pavement.

Once you have identified pavement distress, it is time to repair the damage. There are several products available that allow you to do the job yourself, but if you want to ensure your pavement is properly fixed, it is probably best to call a professional.

If you have any questions or if you would rather leave the repair work to the professionals, contact PTG Enterprises by calling 410-636-8777 or click here

Repairing Lifted Concrete

Wednesday, May 25th, 2011

After Concrete is laid, the inevitable settling, shifting and moving will occur. But in extreme cases, when the ground settles below the concrete or when a tree root comes into contact with the pavement, walkways or patios can break and lift. These unsightly blemishes on your otherwise pristine concrete surface can ruin the entire look and feel of your patio or walkway. And with Memorial Day right around the corner, you are going to want your home to look perfect for your guests.

This article from eHow.com provides 4 ways in which you can quickly repair that broken and lifted concrete.

Instructions

1.     The easiest way to repair lifting concrete pavement is to grind it down. Most driveways are at least 6″ thick by code, so there should be sufficient grinding depth. Walkways and patios are 3″ – 4″ in thickness. Renting a scarifier is probably the most practical way to do this yourself. This is not an easy machine to use, so if you are not comfortable with the job, don’t hesitate to call in a professional.

2.     If the lifting is the result of tree root growth, you will have to grind your cement down repetitively as the roots will continue to push the concrete up. A better solution is to remove the concrete pavement all together, cut out the offending root(s) and re-pour the cement.

3.     A quick fix would be to fill in the ‘step’ created by the raised concrete with a cement adhesive and concrete/polymer fill. Even if you carefully rough up the lower cement, this ramp-like fix will only be a temporary patch at best. It will chip away fairly quickly, especially on a driveway pavement with heavy traffic.

4.     Better left to the professionals, you can float a slab of concrete that has sunk into the ground by drilling holes and pumping in a cement mix. This will literally float the slab back up with the pressure of the concrete beneath.

Now you can enjoy your Memorial Day barbeque without having to hear, “What happened to your patio!?” at least 50 times. If you have any questions or if you would rather leave the repair work to the professionals, contact PTG Enterprises by calling 410-636-8777 or click here today!

How to Rid Yourself of Pavement Ants in Your Driveway

Wednesday, May 18th, 2011

Pavement ants, also known as house ants or sugar ants, can be quite a nuisance. They set up camp in your yard or inside the cracks in your pavement and eventually work their way into your home. The best thing to do when you find pavement ants is to rid yourself of the infestation as soon as possible.

But how can you do that? You are no exterminator and you don’t want to have to run to the hardware store to buy ant spray, right? Well, you can use one household item to help assist you in your quest for an ant free existence – salt.

That’s right, all you need is everyday salt. This article from eHow.com explains several solutions to rid yourself of those pesky pavement ants using nothing but common table salt.

1.   Sprinkle ordinary table salt on cracks in the driveway, along the sides and where the ants are present. Make sure the driveway and surrounding areas are dry before applying salt for the best effectiveness.

2.   Repeat weekly until the ants are gone. After consuming the salt, the ants will drink water or other moisture until they essentially explode. Be aware that the salt will also kill any weeds or plants present, so use caution.

3.   Draw a line with salt at the end of the driveway on the pavement to prevent the ants from crossing over into the lawn or home.

4.   If table salt is not effective, purchase a sweet ant bait trap that contains boric acid salt. (Boric acid is a hydroponic salt.) The ants are attracted to the sugar in the bait, consume the boric acid salt with the sugar, and then take the poison back to their home, where it spreads to the other ants.

5.   Place the ant baits along the sides and ends of the driveway. Use caution when using ant baits because boric acid can be toxic to pets and humans as well as insects.

If you have any questions, contact PTG Enterprises by calling410-636-8777 or click here today!

Installing You Very Own Asphalt Basketball Court

Wednesday, April 27th, 2011

Do you have some unused space in your yard? Do you enjoy playing the game of basketball, but do not have a court near your house? Well, have you ever considered having your very own asphalt basketball court installed? It is actually not as hard or expensive as you may think.

This article from eHow.com explains how you can have your own private basketball court in your backyard.

1.   Rope off your desired area: The dimensions are up to you, but a standard high school half-court is 30 by 30 foot area. So that should be about as small as you want to go.

2.   Dig up the area you laid off: Excavate 7 to 9 inches deep to allow room for the crushed rock and asphalt that you will need to lay. Remove large rocks, as these will create an uneven surface if left alone. Then, once the area is excavated and cleared of all debris, level out the area.

3.   Cover your area with 4-6 inches of gravel: This will act as the base for your asphalt. Compact the gravel by rolling a weighted compaction tool over the entire area. If a weighted tool is not readily available, you can simply walk over the area yourself until it is properly compacted. Make sure there are no uneven spots – high or low – that will create an un-level playing surface.

4.   Spread 2-3 inches of asphalt over the gravel: At this stage, it may be best to hire a professional to actually lay the asphalt. But if you do choose to do the work yourself, level out the asphalt so that it is even throughout the entire court. Compact the asphalt cover in the same manner as you compacted the gravel. Make sure the asphalt is level after it is compacted and allow it to dry fully.

5.   Paint Your Court: You can purchase a stencil to make this part of the job easier.

6.   Add the hoop: You can either use a simple portable basketball hoop or you can install am in-ground hoop that will remain in place.

7.   Enjoy

If you have any questions, or if you would just like to leave the entire process up to the professionals, contact PTG Enterprises by calling 410-636-8777or click here today!

The Benefits of an Asphalt Driveway

Friday, April 22nd, 2011

It is time to resurface your driveway, but you have no idea where to start. Who do you call? What do you need to know? What are your options? At least picking the materials is easy, right; isn’t concrete your only choice? Actually, there is another option – asphalt.

This article from DoItYourself.com explains the four biggest benefits of asphalt driveways over concrete.

1. Weather Resistance

Unlike concrete, asphalt can expand and contract in harsh climates without breaking or cracking. So if you live in an area with extremely cold winters or hot summers, then asphalt might be a no-brainer for your home.

2. Flexible Material

Asphalt has the ability to expand slightly while under pressure or in high or low temperatures. Asphalt has the capacity to adjust and settle, move and expand and contract and conform – meaning less cracking than a rigid concrete driveway.

3. Ease of Repair

Even if your asphalt driveways does crack or settle in an unpleasing way, repairs could not be easier. Refill and level these depressions easily with liquid asphalt emulsions. Fix cracks quickly with a solid cold patch, or tar mixed with fine gravel.

4. Cost

If the first three benefits did not sway your opinion, then this last one will certainly make you an asphalt enthusiast. Asphalt driveways are initially cheaper than concrete driveways and they even take less time to install.  They are also resistant to oils and other stains, making asphalt driveways cheaper to maintain.

If you have any questions, contact PTG Enterprises by calling 410-636-8777or click here today!

Pavement Maintenance

Wednesday, March 23rd, 2011

From the moment your asphalt is installed, it begins to deteriorate. This means that to ensure you have a top-notch parking lot for years to come, you will need to take certain steps to maintain that asphalt. This preventative maintenance will not only make your parking lot last longer, but, in the long run, it will save you money.

Here are a few simple steps you should take to keep your lot looking pristine.

Crackfill

Properly filling cracks is a job of tremendous importance. By filling a small crack properly, you will prevent that fissure from growing and becoming too big to handle by yourself. Filling small cracks saves you from paying to have large cracks repaired.

Sealcoating

This is another great way to improve the overall look of you lot while going the extra mile to protect your parking surface.

Re-Striping

Once the original lines are painted on the asphalt, constant re-striping is required ever 12-18 months.

Signage

Not only will your lot begin to deteriorate, but often signs are knocked down, dented, vandalized or even stolen. It is important to properly maintain your signs – not only for that instant curb appeal, but also for safety.

Wheel Stops

Wheel stops play an integral role in maintaining clear sidewalks and protecting signs. If your wheel stops are damaged, it could negatively affect everything around them.

Now you are well on your way to a beautiful, long lasting parking surface.