Eventually, all asphalt parking lots become too deteriorated to maintain and require restoration or rehabilitation. The asphalt condition (as well as your budget) will usually determine the extent of the project. Some will require a total excavation and replacement, while others may only need to be resurfaced.

So how can you decided if your parking lot needs a surface overlay or a total replacement? This article from AsphaltAdvisor.com can help. It outlines the conditions of each procedure.

Total Excavation and Replacement

There eventually comes a time when every parking lot has outlived its useful life – it is more cost effective to excavate the entire lot and re-install a new one. The property manager or owner needs to evaluate the cost of maintaining the deteriorating pavement over time vs. the cost of replacement. Performing non-stop patching can be expensive.

Assuming the decision has been made to perform a total excavation and replacement, the process, in theory, is a simple one. The entire parking lot is machine excavated, usually by an asphalt milling machine, but this can vary with the size and shape of the lot. Once excavation is completed, the sub-grade stone is evaluated for its condition. Any soft spots will be undercut and new stone installed. Then the base and surface courses of asphalt are re-installed. With this option, the life cycle of the parking lot is reset to zero. The lot is brand new.

Surface Overlay
In some cases, if the sub-grade is good and there is no surface cracking, an overlay only is the proper fix. This is the correct option if the surface is dry, brittle, and raveling. In this situation, a new and additional layer of asphalt is installed over what is already there. It’s important to evaluate the project properly because the grade of the lot will change. Edge milling is required along gutter pans and transition points.

Resurfacing can be a viable option if removal and replacement does not fit your budget. But remember, if you are looking for a long-term solution, it is usually more cost effective to opt for the expensive total excavation and replacement. But in the end, the choice is yours.